There is no custom code to display.

There is no custom code to display.

Public Comment Period Extended For Sites Reservoir

A public comment period has been extended for draft environmental documents on the long-awaited Sites Reservoir. The lake construction is planned for an area west of Williams in Glenn and Colusa Counties, and would hold up to 1.5 Million acre-feet of off-stream storage. It would basically serve as a catch basin for storm water and flood flows after all other water rights and regulatory requirements are met. The public comment period will now run through January 28th. A lot of information can be found at sitesproject.org.